Arcade Fire

Five Star provided full production crew for the Glasgow leg of the Arcade Fire tour booked by promoter AEG Presents. 81 on-site crew split into teams; stage build, LX, sound, video and barrier. The stage team built an audacious ring style stage set up in the centre of the arena at the SSE Hydro. The LX team rigged all the truss with the lights, powered and cabled the entire rig and raised it out. The video team set up and cabled the video walls, while the sound team rigged the speakers to be flown around the stage and the foldbacks on stage for the band. The barrier team set up all the mojo barrier around the stage and control area. The job was excellently managed and overcome the clients logistical site problems, managing to pull almost 50 crew on-site at 3am instead of 8am to get things back on track. During the gig the changeover crew were responsible for swapping the support bands equipment over and setting up the next bands gear.
Crew Total
Days Build
Total Crew Hours